Overview
The MMA Coral operates predominately for our clients in the South East Asia region but has performed a number of scopes in Australia. The vessel is an ideal asset for anchor handling scopes, ocean towing and general supply requirements. The vessel’s dynamic positioning provides ideal maneuverability for working alongside offshore facilities and its cargo capacity provides reliable supply support.
Enquire Today
Key Features
- Notation:
✠A1, Offshore Support Vessel (AH), Fire Fighting Vessel Class 1, Towing Vessel, ✠AMS, ✠DPS-2
- Built:
Built in 2011 by PT. Jaya Asiatic Shipyard
- Port of Registry & Flag:
Singapore & Singapore Flag
- Deck Space:
500m2 free deck space at 10t/m2 deck strength
- Bollard Pull:
108 tonnes bollard pull is ideal for towing scopes
- BHP:
The vessel has a total of 8,000BHP
Vessel Summary
- PARTICULARS
- Vessel Type Anchor Handling Tug Supply
- IMO Number 9594200
- Port of Registry Singapore
- Year Built 2011
- Class ABS
- Notation ✠A1, Offshore Support Vessel (AH), Fire Fighting Vessel Class 1, Towing Vessel, ✠AMS, ✠DPS-2
- DETAILS
- Length Overall 70.05m
- Breadth 17.0m
- GRT-NRT 2,744/823
- Deadweight 2,515t
- Depth Moulded 6.10m
- Maximum draft 6.10m
- Clear deck Space 500m² (600 - 800 max tons total)
- Deck loading 500m²
- Max Speed 14.0kts
- Economical speed 10.0kts
- Bollard Pull tonnes 108t
- Sewage Plant 1 x 50 men, Evac Vacuum
- Rudders 2 x Becker Flap Type S-A
- Joystick MT Bridge Mate
- Flow Meter FW, FO, Base Oil mud
- CAPACITY
- Fuel Oil 700m³
- Potable Water 500m³
- Drill Water 1336.3m³
- Oil Based Mud 492m³
- Dispersant 15m³
- Dry Bulk 200m³ in four tanks
- Foam 15m³
- PUMPING RATES
- Fuel Oil 1 x 117m³/hr@ 80m head
- Potable Water 1 x 120m³/hr @ 90m head
- Drill Water 1 x 125m³/hr @ 75m head
- Oil Based Mud 2 units x 75 cu.m./hr, NORD / 4019 / J / THK
- Dry Bulk 2 x 20m³/hr
- MACHINERY
- Main Engines 2 x MaK 9 M 25 4,000BHP
- Generators 2 x Volvo Penta 350kW
- Emergency Generators 1 x Volvo, D7A T, 122kW
- Bow Thruster 2 x 600kW Tunnel Type
- Propulsion 2 x CPP
- ACCOMMODATION
- Berths 2x20, 1x10
- Total 50
- FIRE FIGHTING
- Class 1
- Monitors 2 x 1,200/300m³/hr
- Pumps 2 x 1,711m³/hr
- DECK EQUIPMENT - Towing Winch
- Type Electro-hydraulic Double Drum waterfall
- Pull 200 tons
- Brake Holding 250t
- Wire Capacity 58mm x 1,400m
- DECK EQUIPMENT - Anchor Handling Winch
- Type Electro-hydraulic Double Drum waterfall
- Pull 200 tons
- Brake Holding 250t
- Wire Capacity 58mm x 750m
- DECK EQUIPMENT - Tugger Winch
- Number & Capacity 2 x 12mt, Electro-hydraulic
- Wire Capacity 24 mm x 220 mtrs
- Other Deck Equipment
- Storage Drum 58mm x 1,400m
- Towing Pins 2 x 200t Electro-hydraulic
- Shark Jaws 1 x 250t Karmfork
- Stern Roller 1 x 250t 2.2m x 4.8m
- Crane 1 x 2t Electro-hydraulic Telescopic Palfinger Crane
- Deck Voltage & Sockets 2 x 440V, 2 x 220V
- Water Maker 2 unit x 5 mt / day
- LIFESAVING
- Liferafts 6 x 25 man
- Lifejackets 63
- FRC/Rescue Boat/Davit 1 x NEUVISA Semi Rigid Rescue Boat
- Lifebuoys 8
- Immersion Suits 6
Projects
Chevron Australia contracted Sapura Clough to provide the transportation and installation of approximately 90 kilometres of 20 inch pipeline, both offshore and onshore, from Barrow Island to the Dampier Bunbury Natural Gas Pipeline.
Technip was contracted by Chevron Australia to manage the installation, commissioning and operation of the Wheatstone Platform (WP), Trunkline and Gas Gathering Systems.
In 2007 MMA was contracted by BHP Billiton to design and deliver a bespoke offtake support vessel.
Safety Performance
Total Recordable Case Frequency
(per million hours)