In 2019, Subsea7 was awarded Julimar Development Phase 2 by Woodside Energy Ltd. The Julimar field is located approximately 200 km offshore North-Western Australia. The full scope of work included the design, procurement, installation and commissioning of a 22 km 18” Corrosion Resistant Alloy (CRA) gas production flowline and an umbilical system. A key feature of Subsea7’s installation was the use of reel-laid pipeline and buckle initiation using the Residual Curvature Method (RCM). Subsea7 selected MMA's Pipe Clamping Mattresses (PCMs) as the preferred walking mitigation system during the detailed design phase instead of piled restraints.
MMA Solution
MMA designed a PCM solution specifically for the Julimar project, optimised for the pipeline coating, maximum submerged weight, installation and distribution along the pipeline. 36 PCM sets were deployed at 3 locations, ensuring that the pipeline walking rate would remain within allowable limits. The solution also included restraining the end terminations and an in-line tee.
Outcome
Subsea7 engaged MMA to conduct an extensive design phase in collaboration with S7 engineers in France, England and Australia. The design phase was followed by the execution phases which included tool production, a factory acceptance test to demonstrate correct fit up and validate the deployment philosophy. The PCMs were fabricated in Karratha before being placed into temporary storage ready for rapid deployment. Subsea7 successfully deployed in April 2021 with the PCMs continuing to provide walking restraint for the pipeline.
Technical Details
PCM Dry Weight |
32.1 Te |
PCM Submerged Weight |
18.6 Te |
Total Axial restraint Load |
~340 Te |
Pipeline to soil interface friction coefficient |
~0.61 |
Qty of PCMs |
36 |
Pipeline Nominal Diameter |
18” |
Pipeline Type |
CRA-clad gas production flowline |
Coating Type and Thickness |
MLPP Parent Coating ~68mm Wall Thickness |
Water Depth |
147 – 174m |
Soil Type |
Calcareous silty sand |
MMA Innovation / Value Added
The application of PCMs provided Subsea7 with unique flexibility in their design of the walking mitigation scheme compared to traditional piled solutions. The design team were able to adjust the location and quantities of the PCM’s at a very late stage in the design process enabling them to respond with agility and confidence to evolving design parameters.
About PCMs
PCMs were originally developed for the Malampaya field for Shell. PCM patents are held by Shell, which has made the technology available to the market through an exclusive global distribution license granted to MMA.